Project Description

  • Temporary helipad,
  • Syphon drainage system,
  • Basement ground prep for concrete slabs, retaining walls, in-ground tanks.
  • Road diversion on Hospital Ave.
  • Excavation works for service tunnel between PCH and K-Block,
  • Earthworks to lift shaft and associated footings for the G-Block Link Bridge,
  • Rainwater/fire tanks and all associated trenching for various services.
  • Install of main drainage line and soak wells,
  • Ground prep to all Swale areas,
  • Install of new kerb line, concrete footpaths, asphalt crossovers to new entrances and exits
  • Earthworks associated with End of Trip ramp, including excavating around high pressure gas main.
  • Ground preparation for all landscaping.