Project Description
- Temporary helipad,
- Syphon drainage system,
- Basement ground prep for concrete slabs, retaining walls, in-ground tanks.
- Road diversion on Hospital Ave.
- Excavation works for service tunnel between PCH and K-Block,
- Earthworks to lift shaft and associated footings for the G-Block Link Bridge,
- Rainwater/fire tanks and all associated trenching for various services.
- Install of main drainage line and soak wells,
- Ground prep to all Swale areas,
- Install of new kerb line, concrete footpaths, asphalt crossovers to new entrances and exits
- Earthworks associated with End of Trip ramp, including excavating around high pressure gas main.
- Ground preparation for all landscaping.
Call us TODAY
Give us a call to discuss your Earthmoving requirements.
- 08 6401 3712
- 0402 378 696